150,000Solar panels screened in a single operating day
Utility scale array, running as a recurring semi annual program
250.9 mAlberta's tallest tower inspected for water ingress
Launched from the roof and flown down the facade, no access equipment
324 acresConstruction site mapped weekly for two to three years
A continuous record, not a folder of site photos
4Pavement corridors measured, Edmonton and Calgary
Approximately 250,000 m² across the program, completed August 2026
8 mStandoff on wind turbine blade inspection
Close enough to resolve what a ground crew cannot see
In serviceFlare stacks inspected while running
Debris and condition checked at height without a shutdown
0.01 mRMSE reported at 2.51 cm per pixel
Measured against checkpoints rather than assumed